hit counter script

Cisco ASR 907 Hardware Installation Manual page 63

Hide thumbs Also See for ASR 907:
Table of Contents

Advertisement

Installing the Cisco ASR 907 Router
Installing Plenum Assembly and Chassis in the Rack
Step 5
Secure the air baffle using a maximum torque of 11.5 in.-lb (1.3 N-m). See figure below.
Figure 13: Securing the Air Baffle Tray
1
Securing air baffle to air plenum
-
Cisco ASR 907 Router Hardware Installation Guide
51

Advertisement

Table of Contents
loading

Table of Contents