Cisco Cat4K NDPP ST
EDCS-1228241
Component
AGD_OPE.1
The Administrative Guide provides the descriptions of the
processes and procedures of how the administrative users of the
TOE can securely administer the TOE using the interfaces that
provide the features and functions detailed in the guidance.
AGD_PRE.1
The Installation Guide describes the installation, generation, and
startup procedures so that the users of the TOE can put the
components of the TOE in the evaluated configuration.
ALC_CMC.1
The Configuration Management (CM) document(s) describes
how the consumer (end-user) of the TOE can identify the
evaluated TOE (Target of Evaluation). The CM document(s)
ALC_CMS.1
identifies the configuration items, how those configuration items
are uniquely identified, and the adequacy of the procedures that
are used to control and track changes that are made to the TOE.
This includes details on what changes are tracked, how potential
changes are incorporated, and the degree to which automation is
used to reduce the scope for error.
ATE_IND.1
Cisco will provide the TOE for testing.
AVA_VAN.1
Cisco will provide the TOE for testing.
How requirement will be met
58
11 March 2014