hit counter script

Cisco RFGW-10 Hardware Installation Manual page 151

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 6
Cabling the Cisco RFGW-10 UEQAM
Table 6-3
RF Switch Universal Cable Holder Reference Color Coding
RF Switch Line Card Port
RFSW Slot 12
RFSW Slot 11
RFSW Slot 10
RFSW Slot 9
RFSW Slot 8
RFSW Slot 7
RFSW Slot 6
RFSW Slot 5
RFSW Slot 4
RFSW Slot 3
To replace cables or install new cables in an UCH2, complete the following steps:
Step 1
Use the T-10 TORX driver tool to loosen the lock bar on the side where the cable will be installed (See
Figure
Figure 6-9
Step 2
Use a flat-head screwdriver as a lever to slide open the lock bar (if needed). (See
OL-16264-04
Cable Color
Red
White
Blue
Green
Yellow
Violet
Orange
Black
Gray
Brown
6-9).
Using the T-10 TORX Driver Tool to Loosen the UCH2 Lock Bar
Installing or Replacing the Cables in the UCH2
RF Switch User-Defined
Cisco RF Gateway 10 Hardware Installation Guide
Figure
6-10.)
6-11

Advertisement

Table of Contents
loading

Table of Contents