Connecting Power to Cisco RFGW-10 UEQAM
Note
To meet the electromagnetic interference (EMI) requirements, the DC power supply should be removed
from the chassis if the PEM has failed or the circuit breaker is off.
Step 4
Attach the other end of the cable to the site ground connection.
Step 5
Remove or rotate the plastic cover from the terminal block.
Caution
Before you continue to install the terminal block ground wires, stop and perform Step 6 to prevent any
contact with metal lead on the ground wire and the plastic cover.
Step 6
You must wrap the positive and the negative lead cables with the sleeves. Take each lead wire and cover
the area from the lug to the wire with heavy shrink sleeve.
Step 7
Insert the negative lead cable first. Replace the ground lug with cable in the following order:
a.
Washer
b.
Ground lug with negative wire
c.
Kepnut screw
Step 8
Tighten the Kepnut screw to the recommended torque of 18 in-lbs minimum to 22 in-lbs maximum.
Step 9
Repeat Step 6 through Step 8 for the RTN lead cable.
Note
Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.
Step 10
Replace and rotate the terminal block plastic cover back into position until it is locked.
Cisco RF Gateway 10 Hardware Installation Guide
3-26
Chapter 3
Cisco RFGW-10 UEQAM Installation
OL-16264-04