hit counter script

Chapter 4 Procedures Before Operation - Mitsubishi Electric RJ51AW12AL User Manual

Melsec iq-r anywireaslink master module
Hide thumbs Also See for RJ51AW12AL:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Configuring a system
Configure an AnyWireASLINK system and set parameters which are required for start-up.
• WIRING ( Page 28 WIRING)
• Parameter setting( MELSEC iQ-R AnyWireASLINK Master Module User's Manual (Application))
• Address setting of slave modules ( MELSEC iQ-R AnyWireASLINK Master Module User's Manual (Application))
• Automatic address detection function ( MELSEC iQ-R AnyWireASLINK Master Module User's Manual (Application))
2.
Powering on the system
Power on and start the system in the order shown below.
• Turn on the 24VDC external power supply for the AnyWireASLINK system.
• Turn on the power supply of the programmable controller.
3.
Checking operations with the LEDs
Check whether communications are established normally.
When the communications are established normally, the following LED on/off statuses are as follows.
• RUN LED: On
• ERR LED: Off
• LINK LED: Flashing
• SET LED: Off
• ALM LED: Off
4.
Programming
Create a program. For details, refer to the following.
Page 34 COMMUNICATION EXAMPLE
• If the programmable controller is powered on before the 24VDC external power supply in the
AnyWireASLINK system, a transmission cable voltage drop detection error may occur.
• To power off the system, power off the programmable controller, and turn off the 24VDC external power
supply in the AnyWireASLINK system.
4 PROCEDURES BEFORE OPERATION
4
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r series

Table of Contents