hit counter script

Power Requirements; Section 1.0 Introduction - GE BrightSpeed Elite Preinstallation Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
5141177-100, R
IRECTION
EVISION
Chapter 8

Power Requirements

Section 1.0
Introduction
The power distribution unit (PDU) supplied with the system transforms and distributes power to all
system components. The PDU is the only power entry point required to operate system.
To minimize voltage regulation effects, power wiring between the facility main distribution panel and
the PDU should be kept as short as possible.
When routing the power wiring all three phase wires and ground must be run in the same conduit
or raceway duct. Power wires should be routed separately from system control and signal cables,
using a separate conduit or trough in raceway duct.
Metallic conduit, floor duct or surface raceway may be used for running cables, depending upon
local codes and practices. However, cable passageways should be large enough to install any cable
with all other cables already installed. Use of non-metallic conduit is not recommended.
14
Chapter 8 - Power Requirements
B
S
E
, E
, E
RIGHT
PEED
LITE
DGE
XCEL
: P
-I
RE
NSTALLATION
Page 127

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brightspeed edgeBrightspeed excel

Table of Contents

Save PDF