hit counter script

Rack-Mounting The Chassis - Cisco CGR 2010 Installing And Connecting

Hide thumbs Also See for CGR 2010:
Table of Contents

Advertisement

Installing and Connecting the Router
Installing the Router in a Rack
Note:
Allow at least one rack unit of vertical space above the router.

Rack-Mounting the Chassis

The Cisco CGR 2010 router can be installed in a 19-inch (48.26-cm) standard rack.
You can mount the router in the following ways:
Power-supply side mounting—Brackets attached at the power supply side of the chassis with the power-supply side
facing forward.
Cable-side mounting—Brackets attached at the cable side of the chassis with the cable side facing forward.
Figure 1 on page 28
Figure 1
Rack-Mount Brackets for the Cisco CGR 2010 Router
Attaching Rack-Mount Brackets to Cisco CGR 2010 Routers
To attach the long side of each bracket to the Cisco CGR 2010 router, use four of the supplied number-8 Phillips flat-head
screws.
Figure 2 on page 28
Figure 2
Bracket Installation for Power-Supply Side Mounting
Figure 3 on page 29
shows the rack-mount brackets used with the Cisco CGR 2010 router.
shows how to attach the brackets to the sides of the router with the power-supply side forward.
PS U1
SFP
SFP
CAU TION
0/1
GE
ACT
0/0
GE
SLO T
: This unit
EN
0/1
one pow
may have
EN
0/0
er sour ce.
mor e than
LINK
sour ces
Disc onne
LINK
befo re serv
ct all pow
3
USB
PSU
elec tric
icing to
er
1
shoc k.
avoi d
CON
2
SYS SPD
SPD SPD
SPD
2
0
CON SOL
E
1
shows how to attach the brackets to the sides of the router with the cable-side forward.
PS U2
CF1
DO NOT
REM OVE
NET WOR
DUR ING
CF0
PS
K OPE RAT
Inpu t Term
ION
Type
inal
Sym bol
Inpu t Rati
Lo V DC
ng
DO NOT
Per Sou
REM OVE
Lo
rce
NET WOR
DUR ING
Hi V DC
24 - 60
K OPE RAT
Hi
V
ION
or
10A
100- 250V
V AC
~
2A
100- 240V
Cis co Co
~
50-6 0 Hz
nn ec ted
2A
Gr id Ro
ute r 20 00
Se rie s
28

Advertisement

Table of Contents
loading

Table of Contents