hit counter script

Cisco 807 Hardware Installation Manual page 37

Industrial integrated services router
Table of Contents

Advertisement

To install the ground connection, follow these steps:
1.
Locate the ring terminal lug and screws in the packaging kit. Store the ground screws for later use.
2.
Use a wire stripping tool to strip the 14 or 18 AWG (1.6mm or 1.02mm) grounding wire to 0.22 in. (5.56 mm).
3.
Insert the ground wire into the ring terminal lug, and using a crimping tool,
crimp the terminal to the wire.
4.
Insert the ground screws (2) into the grounding lug (1) shown in the
graphic and attach the lug to the router.
NOTE: if your grounding lug is a single hole type, attach it in the same
manner as the dual hole using the first hole from the front panel.
5.
Use a ratcheting torque screwdriver to tighten the ground screw and ring terminal to the router side panel to 3.5 in-lb
(0.4 N-m). The torque should not exceed 3.5 in-lb (0.4 N-m).
6.
Attach the other end of the ground wire to a grounded bare metal surface, such as a ground bus, a grounded DIN
rail, or a grounded bare rack.
35

Advertisement

Table of Contents
loading

Table of Contents