•
During operation, do a check of the stretching
screws and the locknuts at regular intervals. Tighten
the stretching screws and the locknuts if it is
necessary. The vibrations can cause the stretching
screws and the locknuts to loosen.
•
If the product is lifted and moved, do a check of the
stretching screws and the locknuts before the
operation continues. Tighten the stretching screws
and the locknuts if it is necessary. The transport can
cause the stretching screws and the locknuts to
loosen.
To pull out the winch cable
The 30 m/98 ft winch cable can be pulled out freely if the
winches are disengaged.
1. Turn the winch handle rearward 2 turns without load.
2. Remove the winch handle.
3. Pull the cable to unwind it.
4. Put the winch handle back.
To move the product forward
1. Put the winch cable (A) through the pulley (B).
A
1499 - 001 -
C
B
2. Pull out the winch cable and attach the carabiner (C)
at the remote end of the work area.
3. Turn the winches at each end of the product.
4. Make sure that the winch cable is perpendicular to
the product. If not, the product moves laterally during
operation.
To set the speed of the forward movement
There are 2 different shafts on the winches. The speed
of the forward movement is different for the 2 shafts.
•
Put the winch handles at the top shafts for higher
speed.
•
Put the winch handles at the bottom shafts for lower
speed.
•
Make sure that the winches on the 2 ends of the
product are at the same shaft position. If the winches
are not at the same position, the product does not
move at equal speed on the 2 ends.
To stop the product
To stop the electric drive unit (BT 90 EI)
1. Set the power switch to OFF.
2. Disconnect the power cord from the power source.
WARNING Always disconnect the power
cord from the power source when the
product is not in operation.
To stop the fuel drive unit (BT 90 GI)
1. Move the throttle control to the idle speed position.
2. Set the engine ON/OFF switch to OFF. The engine
stops.
3. Move the fuel valve to the OFF position.
11