hit counter script

Test Operation - LG PUCKA0 Installation Manual

Table of Contents

Advertisement

Test Operation

Test Operation
Before test operation, be sure all information is understood completely, and follow the
guideline of manual.
n Check the refrigerant piping of outdoor unit.
(Additional charging of the refrigerant ,the maximum allowed piping length and open the stop valve)
* For more detailed information of that, refer to the installation manual supplied with the
outdoor unit.
n Executing the test operation.
1. Connect the power and turn on with the wired remote controller(PQRCUSA0/1).
2. Check the AHU(Field supply) and outdoor unit operation when the wired remote
controller (PQRCUSA0/1) is controlled.
1
2
3
4
5
6
7
8
Please attach the inform label inside of the door.
Please choose proper language defend on your
country.
* For more detailed function of the wired remote controller, refer to the Owner's &
Installation manual supplied with the wired remote controller.
* Button ③,④,,⑫ on the wired remote controller(PQRCUSA0/1) is not operated.
18 AHU Control Kit
OPERATION INDICATION
1
SCREEN
2
SET TEMPERATURE Button
WIRELESS REMOTE (Do not operate)
3
CONTROLLER RECEIVER
• Some products don't receive the
wireless signals.
9
4
VENTILATION Button (Do not operate)
5
OPERATION MODE SELECTION
10
Button
11
6
SUBFUNCTION Button
12
7
FUNCTION SETTING Button
13
8
EXIT Button
14
9
ON/ OFF Button
15
10
ROOM TEMPERATURE Button
11
FAN SPEED Button
12
AIR FLOW Button (Do not operate)
13
RESERVATION/ TIME SETTING
Button
14
SETTING/ CANCEL Button
15
UP, DOWN, LEFT, RIGHT Button

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents