R 02/92
5 Putting into Operation
Basic Connector
5.1
Any of the three 1P 243 versions (i.e., with full or part configuration) has a basic connector which
provides the link to the SIMATIC S5 bus, and the S5 bus, respectively. This connector is located on
the upper half of the module.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
Basic connector pin assignment
5.2
Front Plate and Front Connector
The required 43-way front connector is available in versions for crimp connection or screw
connection:
– Crimp connection:
– Screw connection:
d
b
M
PESP
AB O
AB 1
AB 2
AB 3
AB 4
AB 5
AB 6
AB 7
AB 8
AB 9
AB 10
AB 11
M
Order No. 6XX3068
Order No. 6XX3081
Putting into Operation
z
+5 v
CPKL
DE33
5 – 1