Installing and Removing Components
Step 4
Reinstall the IFMs and expansion modules.
a) Go to
Installing an Intelligent Fabric Module, on page
b) Go to
Installing an UCS X-Fabric Module Blank, on page
Step 5
Reconnect all power cables.
The chassis automatically powers on when it receives inlet power.
Removing the Power Entry Modules
PEMs support inlet power to the chassis from the facility. It is a best practice to remove all power from the
system when replacing a PEM.
Danger
Follow all electrical safety precautions when working with facility power. Failure to do so can result in damage
to equipment or pose a risk of injury or death to personnel.
Note
The following task shows removing both PEMs. If you are removing only one PEM, you will need to loosen
only the PEM screw for the replaced PEM, not both screws as shown in the illustrations.
Before you begin
The power entry modules (PEMs) are connected to facility power, so you must disconnect facility power from
the PEM that you will be removing.
Removing the Power Entry Modules
90.
92.
Cisco UCS X9508 Server Chassis Installation Guide
81