Toro Twin Cylinder Engine Installation (continued)
Kawasaki Engine Replacement
Kawasaki Engine Removal
Kawasaki Engine Installation
Engine: Service and Repairs
Note: Verify Engine speed is set to proper RPM specification for the
applicable model.
1. Park the machine on a level surface and disengage the PTO. Stop the engine,
wait for all moving parts to stop, and remove key. Engage the parking brake.
2. Disconnect the battery by removing the negative cable first, then the positive
cable from the battery.
3. Remove the engine guard.
4. Remove the muffler.
5. Remove the mower belt.
6. Remove the hydrostatic drive belt.
7. Disconnect the chassis wire harness from the main engine wire harness.
8. Disconnect the red wire from the starter.
g321704
9. Disconnect the black engine ground wire.
10. Disconnect the fuel supply line at the fuel filter.
11. Remove vent line at splice with Toro supplied hose.
12. Disconnect the throttle cable.
13. Disconnect the choke cable.
14. Remove the clutch mounting bolt and washer. Slide the clutch off of the
crankshaft.
15. Remove the engine pulley.
16. Remove the engine mounting bolts.
17. Lift the engine away from the frame.
1. Prepare the frame and secure any fuel lines or wire harness components.
2. Lower the engine onto the frame.
Figure 15
Page 4–10
Titan Service Manual
3438-774 Rev A