Preparing for Installation
Before installing your router, you must consider power and cabling requirements
that must be in place at your installation site, special equipment for installing the
router, and the environmental conditions your installation site must meet to
maintain normal operation. This chapter guides you through the process of
preparing for router installation.
The shipping package for the router is engineered to reduce the chances of product
damage associated with routine material handling experienced during shipment.
•
•
Inspect all items for shipping damage. If an item appears damaged, contact a
Cisco customer service representative immediately.
This chapter contains the following installation topics:
•
•
•
•
OL-17441-01
The router should always be transported or stored in its shipping package in
the upright position.
Keep the router in the shipping container until you have determined the
installation site.
Safety Guidelines, page 2-2
Site Requirement Guidelines, page 2-6
PRP Port Connection Guidelines, page 2-22
Alarm Display Connection Guidelines, page 2-31
Cisco XR 12410 and Cisco XR 12810 Router Installation Guide
C H A P T E R
2
2-1