hit counter script

Mitsubishi Electric NZ2GN2S-D41P01 User Manual page 356

Cc-link ie tsn fpga module
Table of Contents

Advertisement

Setting method
Calculate synchronization cycles from the formula below.
Synchronization cycle = Basic period (Communication period interval setting)  Magnification
Item
Basic period (Communication period interval setting)
Magnification
Set the synchronization cycle to satisfy the following condition.
1ms  Synchronization cycle  1000.00ms
Set the basic period setting for master station parameters to satisfy the following conditions.
■Condition 1
Set the basic period (communication period interval setting) so that it matches the inter-module synchronous fixed scan
interval setting.
■Condition 2
Configure the setting so that the transient transmission time satisfies the setting range shown below.
Communication speed
Master station
1Gbps
100Mbps
*1 Use a TN HUB when communicating between Master station and FPGA module with different communication speeds.
For the setting procedure, refer to the manual for the master station being used.
Ex.
The following figure shows an example of a synchronization cycle.
(1)
(1) Basic period
(2) Normal speed
(3) Low speed
12 FUNCTIONS
354
12.10 CC-Link IE TSN Network Synchronous Communication Function
Description
Setting values of the communication period interval setting of master station parameters
Magnification that is determined by the following master station parameters
• Setting values of the communication period setting for network configuration setting
• Setting values of the multiple period setting for master station parameters
FPGA module
1Gbps
*1
100Mbps
100Mbps
(2)
(3)
Value that can be set for the transient transmission time
350s or more
22s or more
350s or more

Advertisement

Table of Contents
loading

Table of Contents