hit counter script
Table of Contents

Advertisement

Figure 31
Pump �
assembly
Tube #1
Rubber �
elbows(3)
14. Connect the condensate pump to the ICR relay of
the terminal of the board as shown in Figure 32 &
34 whichever is applicable Make sure to fasten the
pump wire through the wire clip on the back side of
the control barrier as shown in Figure 33.
Figure 32
BL
Copyright ©2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Spraying �
Tube
Tube #2
BL
15. Assembly the unit back following the reverse order
of disassembly.
NOTE: All tube should be inserted into rubber elbows
by at least 1/2"
Figure 33
Figure 34
- 27 -
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents