Administration Settings
Reboot
Reboot
STEP 1
STEP 2
Status
Switch Setting
STEP 1
STEP 2
STEP 3
STEP 4
Cisco SRP500 Series Services Ready Platforms Administration Guide (SRP520 Models)
Use the Reboot page to power cycle the SRP (if necessary) from the Configuration
Utility.
Click Administration > Reboot. The Reboot window opens.
Click the Reboot button to power cycle the SRP.
Use the Status page to view the CPU and Memory status for the SRP. The status
information is displayed in real time.
To access this page, click Administration > Status.
From this page you can view the following:
•
CPU–MIPS, Loads and Uptime.
•
Memory–Shows the memory's Total size(%), Free size(%), Used size(%),
Buffer size(%), Cached size(%), active size and inactive size(%
On DSL models SRP526W and SRP527W, Ethernet port 4 can be configured as a
WAN port. You can also set the "jumbo mode" packet size from this window.
Click Administration > Switch Setting.
The Switch Setting window opens.
Select Disable to configure Ethernet port 4 as a WAN port. Select Enable to
configure Ethernet port 4 as a LAN port.
Choose a Jumbo packet size.
Click Submit to save your settings.
8
208