hit counter script

Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 161

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch
1
Cable guide assembly
3
Attachment bracket
Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush
Step 5
against the chassis. Secure the cable management assembly in place to the front of the chassis with the
two captive installation screws. (See
Figure 3-22
1
Captive installation screws (2x)
OL-5781-08
Figure
Securing the Cable Management Assembly to the Front of the Chassis
Installing a Catalyst 6509-V-E Switch Chassis
2
6-32 screws (4x)
3-22.)
1
Catalyst 6500 Series Switches Installation Guide
3-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents