Tier 2 CRU information
You may install a Tier 2 CRU yourself or request IBM to install it, at no additional
charge, under the type of warranty service that is designated for your server.
Operator information panel assembly
To remove the operator information panel assembly, complete the following steps.
1. Read the safety information that begins on page vii, and "Handling
2. Turn off the server and peripheral devices, and disconnect the power cords and
3. Remove the top cover and bezel (see "Removing the cover and bezel" on page
4. Note where the light path diagnostics ribbon cable and front USB cable are
5. Press the blue release button above the front-panel assembly and pull the
6. Press the blue release lever on the operator information panel assembly to the
7. Press the retention clips on each side of the information panel assembly and
8. Press the retention clip on the right side of the information panel assembly and
To install an operator information panel assembly, complete the following steps:
1. Guide the light path diagnostics ribbon cable and front USB cable through the
48
IBM System x3850 Type 8864: Problem Determination and Service Guide
Release lever
Retention clip
static-sensitive devices" on page 31.
all external cables necessary to replace the device.
31).
connected, and then disconnect both cables from the I/O board.
assembly out of the server approximately one inch (25 mm).
left and gently pull the information panel assembly out of the front-panel
assembly until it stops.
continue pulling the information panel assembly out of the front-panel assembly
until it stops.
pull the information panel assembly out of the front-panel assembly.
front-panel assembly first, and insert the information panel assembly into the
front-panel assembly until the blue release lever on the front engages.
Retention clips
Release button