hit counter script

Cisco Nexus 7000 Hardware Installation And Reference Manual page 294

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Installing an I/O Module
48-port 10/100/1000 Ethernet module (N7K-M148GT-11)
48-port 10/100/1000 Ethernet module with XL option (N7K-M148GT-11L)
48-port 1-Gigabit Ethernet I/O module (N7K-M148GS-11)
48-port 1-Gigabit Ethernet I/O module with XL option (N7K-M148GS-11L)
48-port 1-/10-Gigabit Ethernet I/O modules with XL (N7K-F248XP-25 and N7K-F248XP-25E)
32-port 10-Gigabit Ethernet I/O module (N7K-M132XP-12)
32-port 10-Gigabit Ethernet I/O module with XL option (N7K-M132XP-12L)
32-port 1- and 10-Gigabit Ethernet I/O module (N7K-F132XP-15)
8-port 10-Gigabit Ethernet I/O module with XL option (N7K-M108X2-12L)
You can replace each of these I/O modules with another module of the same type while the Cisco Nexus
7000 Series switch is operational. To do this action, you must first remove an I/O module from the
chassis, and then install a new or replacement I/O module in the newly vacated slot within a couple of
minutes to maintain the designed airflow.
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution
Warning
when servicing. Statement 1034
Make sure that you wear an ESD wrist strap while you handle each I/O module. Hold the module only
Caution
on its carrier edges without touching any electronic circuitry, and place it on antistatic mats or repack it
in its original packing material when it is not installed in the chassis.
If you cannot immediately replace an I/O module, either leave the I/O module in its slot or replace it with
Caution
a blank module so the system airflow is not disrupted. Leaving an I/O module slot open for more than a
couple of minutes can disrupt the system airflow causing the system to overheat and shut down.
To replace an I/O module, follow these steps:
Place antistatic mats or antistatic foam where you can place the old and new I/O modules. Choose a place
Step 1
that prevents damage to the module while it is outside the chassis.
Unpack and place the replacement I/O module on an antistatic mat or antistatic foam.
Step 2
Disconnect each I/O cable from the front of the module by doing the following:
Step 3
For the 48-port 10/100/1000 Ethernet I/O module (N7K-M148GT-11 and N7K-M148GT-11L),
unplug each cable.
For the 48-port 1-Gigabit Ethernet types of I/O modules (N7K-M148GS-11 and
N7K-M148GS-11L) and the 48-port 1- and 10-Gigabit Ethernet I/O module (N7K-F248XP-25),
remove the fiber-optic cables and then remove the SFP transceivers.
For the 32-port 10-Gigabit Ethernet types of I/O modules (N7K-M132XP-12, N7K-M132XP-12L,
and N7K-F132XP-15), remove the fiber-optic cables and then remove the SFP+ transceivers.
For the 8-port 10-Gigabit Ethernet I/O module (N7K-M108X2-12L), remove the fiber-optic cables
and then remove the X2 transceivers.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
10-36
Chapter 10
Installing or Replacing Components
OL-23069-07

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents