For Husqvarna Parts Call 606-678-9623 or 606-561-4983
4.
Tighten the hydrostatic transmission
cable clamp. Press the link joint onto its
fastener and attach the locking spring.
5.
Attach the link joint to the rear part of the
hydrostatic transmission cable. Screw
10-12 turns so that the link joint has the
right length.
6.
Run the hydrostatic transmission cable
along with the other cables. Place the
hydrostatic transmission cable in the
cable holder under the articulated
steering's bearing.
7.
Place the hydrostatic transmission cable
in place and screw it in place with the
rear clamp under the left drive shaft.
8.
Adjust the hydrostatic transmission cable
as shown, see "Adjusting of the
Hydrostatic Transmission Cable" on
page 38.
52
English-
REPAIR INSTRUCTIONS
Adjusting the hydrostatic transmission cable
www.mymowerparts.com
Front clamp
Rear link joint
Cable holder
6019-024
6019-025
6019-364
6020-002