hit counter script

Figure 6-2: Vertical Placement - Linksys WET54Gv2 User Manual

Wireless-g ethernet bridge
Table of Contents

Advertisement

Wireless-G Ethernet Bridge
Stand Option
1. The Bridge has eight rubber inserts, four on each side. Remove the two rubber inserts that are adjacent to the
power port.
2. The Bridge includes two triangular stands. Insert a stand into an opening. Push the stand up to snap it into
place.
3. Repeat step 2 using the second stand.
4. Place the Bridge in an appropriate location.
5. If necessary, adjust the antenna so that it points straight up in the air. (See Figure 6-2.)
The installation of the Wireless-G Ethernet Bridge is complete.
Chapter 6: Connecting the Wireless-G Ethernet Bridge for Network Use
Placement Options

Figure 6-2: Vertical Placement

14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wet54g v2

Table of Contents