hit counter script

Install Front Castors; Install Upper Handle - Toro 30196 Operator's Manual

48" mid-size mower
Hide thumbs Also See for 30196:
Table of Contents

Advertisement

Assembly
DESCRIPTION
Fuel tank
Bolt 5/16–1/ x 7/8" (22.5 mm)
Lock washer 5/16"
Washer 5/16"
Stud
Spring
Hose clamp
Operator's Manual
Engine Operator's Manual
Parts Catalog
Registration card

Install Front Castors

1.
Align castors with holes on top and front of
mower and insert (8) 3/8–16 x 3/4" (19 mm)
bolts through mower. Secure with (8) 3/8–16
flange nuts below mower (Fig. 1).
Note:
Tighten lower bolts first to pull castor
against front, then top bolts last.
2.
Torque bolts to 30–35 ft. lb. (40–47 N m).
Figure 1
1. Front castor
2. Bolt 3/8–16 x 3/4" (19 mm)
14
m–3777
3. Flange nut 3/8–16
QTY.
1
2
2
4
Install fuel tank
2
2
1
1
Read before operating machine
1
1
Fill out and return to Toro
1

Install Upper Handle

1.
Position handle outside frame and align upper
handle mounting holes with desired mounting
holes in rear frame. High, medium or low
according to operators height (Fig. 2).
2.
Secure each side with (2) 3/8–16 x 1" (26mm)
bolts and (2) 3/8–16 locknuts (Fig. 2).
3.
Torque bolts to 25 ft. lbs. (34 N m).
1. Upper handle
2. Rear frame
3. Bolt 3/8–16 x 1" (26mm)
USE
Figure 2
4. Locknut 3/8
5. Low
6. High
m–4213

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proline 14 hp30197Proline 15 hpProline 30196

Table of Contents