Chapter 3
Maintaining the Server
If your server has two GPUs, skip the following step. The filler panel shunts airflow to the PCIe riser in
Note
which a GPU is installed. A system with two GPUs does not use the filler.
Step 18
If your system has only a single K80 GPU, install the filler panel to the air baffle base in slot 2 as shown
in
Figure
Figure 3-31
1
Air baffle base
2
Filler panel
3
Bridge
Install the bridge to the air baffle. Ridges on the bridge legs slide into slots on the air baffle base (see
Step 19
Figure
If the server has a SuperCap power module (RAID battery unit), install it to the holding clip on the new
Step 20
air baffle (see
a.
Set the module into the clips and gently press down until the clip closes over the module.
Route the module's cable through the opening in the air baffle (see
b.
interfere with the server top cover.
OL-32474-01
3-31. Slide the filler panel edges into the slots as shown.
Air Baffle Filler Panel and Bridge
4
5
3-31).
Figure
3-31).
Installing or Replacing Server Components
3
4
Holding clip for SuperCap module (RAID battery)
5
Path for SuperCap module cable through air baffle
opening (SuperCap module not shown)
Cisco UCS C240 M4 Server Installation and Service Guide
2
1
Figure
3-31) so that it does not
3-61