Operation Manual A175-M66 HT564997 English Original Operation Manual Chapter Document-ID Introduction HZTL4005_EN_E Safety HZTL4023_EN_B Safety data sheet HT564997 Product description HZTL4033_EN_A ABB Turbocharging...
Page 2
Operating limits and replacement intervals The recommended replacement intervals and the corresponding operating limits in chapter 3 are jointly defined with the enginebuilder. This information is specific to the product. Non-observance of the recommended replacement intervals and the operating limits increases the risk of unpre- dictable component failures.
Page 9
Check the package for damage. If the package is damaged, the turbocharger or cartridge group must be checked and repackaged by an ABB Turbocharging Service Station. After every 3 years, the following steps must be carried out by an ABB Turbocharging Service Station: Checking the component ...
Operation Manual / 1 Introduction Introduction Page 8 / 8 Contact information Contact information of the ABB Turbocharging Service Stations is available online. Scan the QR code to access our website. ABB Turbo Systems Ltd Bruggerstrasse 71a CH-5401 Baden Switzerland www.abb.com/turbocharging...
Safety Introduction Turbochargers manufactured by ABB Turbo Systems are state of the art and comply with the respective health and safety standards in effect at the time the turbocharger was built. This ensures safe operation of the turbocharger. Nevertheless, there may be some residual risks during operation of and work on the turbocharger which: ...
The specific operating limits of the turbocharger were determined on the basis of information from the enginebuilder about the intended use. These data are given on the rating plate. ABB Turbo Systems accepts no liability and rejects all warranty claims for any non-intended uses.
Deflagration on gas engines ABB turbochargers can tolerate a deflagration with a transient pressure increase of 12 bar. ABB Turbo Systems recommends subjecting the turbocharger to a visual inspection after a deflagration event. As part of the inspection, the position of the turbine casing and the position of the compressor casing to the bearing casing must be checked, and the bearing casing must be examined to see if it has shifted in relation to the bracket.
The locations of the rating plates are defined in the Operation Manual / Product description. Periodic check of the pressure vessels The pressure vessels used by ABB Turbo Systems, for example, in the wet or dry cleaning process, are so-called simple pressure vessels.
Page 22
Page 12 / 17 Hot surfaces on the non-insulated turbocharger Non-insulated turbochargers can cause serious injuries to personnel (burns). ABB Turbo Systems supplies the turbocharger with or without insulation in WARNING accordance with the purchase order received from the enginebuilder. If sup-...
This document is valid for different turbocharger design variants. As a result, it might contain sections and descriptions of components that do not apply to a certain turbocharger. If you have any queries about a design variant, ABB Turbocharging Service Stations will be pleased to provide information (see Contact information at www.abb.com/turbocharging).
Figure 3: Warning plates on the turbocharger If warning plates are not present in the designated locations or not readable, proceed as follows: Order new warning plates from ABB Turbocharging Service Stations. Remove any warning plates that have become unreadable.
One rating plate each is attached on the left and the right side of the foot of the turbocharger. On turbochargers with insulation from ABB Turbo Systems, at least one additional rating plate is attached to the insulation of the gas outlet casing.
Continuous escape of NOTICE an oily fluid indicates an oil leak. If there is a leak, contact an ABB Turbocharging Service Station. Commissioning after taking out of operation If present Remove cover plates (blind flanges) on the compressor casing, on the gas-inlet as well as ...
necessary pressure assured at the oil inlet. For monitoring the lubricating oil pressure, ABB Turbo Systems recommends installing a ma- nometer "M". If the pressure is controlled electronically, the appropriate signals are to be trig- gered at the warning and alarm values.
Agree on a shortened service interval with ABB Turbo Systems. 5-year service inspection To prevent machine damage caused by ageing and downtime, we recom- mend having an inspection carried out by an ABB Turbocharger Service Sta- NOTICE tion no later than 5 years after the last service. 5.2.1 Service procedures every 25 …...
Page 62
Operation and service Page 32 / 113 5.2.3 Service work every 8000 ... 12000 hours of operation Checking and assessment of the rotor and the bearing parts must be carried out by an ABB Turbocharging Service Station. Dismantle the turbocharger. ...
Page 69
Have any heavily contaminated absorption segments and filter rings as well as damaged connecting rods replaced by an ABB Turbocharging Service Station. Fitting the cover grids and absorption segments (see Figure 20) Penetration of dirt and foreign particles Any penetration of dirt and foreign particles into the compressor can damage it.
The time period between the periodical cleaning cycles depends greatly on the operating con- ditions. Cleaning should normally be done every 25 ... 100 hours of operation. If the specified cleaning intervals are incompatible with operation of the engine, contact ABB Turbo Systems.
The use of fuels with poor quality in conjunction with high exhaust gas temperatures can lead to extremely hard deposits on turbine components. ABB Turbo Systems recommends the use of fuels with low ash, sulphur, sodium and vanadi- um contents.
Page 77
Cleaning method Cleaning of the turbine and the nozzle ring during operation is carried out by the cleaning method described in the following and is tested and approved by ABB Turbo Systems: Wet cleaning Wet cleaning makes use of various effects. These effects are used with varying levels of intensity, depending on the type of contamination: ...
Page 78
Wet cleaning of turbine and nozzle ring Prerequisites The following operating state and the following prerequisites have been tested and approved by ABB Turbo Systems for cleaning operations: Set the engine load between 20 … 50 % so that the turbine inlet temperature is between ...
If there is no drainage system, the amount of water injected can be monitored with a flowmeter in the water supply. The permitted amount of water must be determined with the help of an ABB Turbocharging Service Station. To be observed during cleaning ...
To prevent significant loss of effi- ciency, specific tolerances must be fulfilled. If there is any doubt about the extent of the rubbing, contact an ABB Turbocharging Service Station. Have a dimension check carried out by an ABB Turbocharging Service Station.
If the turbocharger surges continuously or periodically, parts of it can be damaged. CAUTION Slowly reduce the engine load. Have the cause clarified immediately by an ABB Turbocharging service station and rectified. Have components inspected for damage and, if necessary, replaced by ...
ABB Turbo Systems recommends having further operations carried out only by trained personnel from an ABB Turbocharging Service Station. Marking casing position for assembly ABB Turbo Systems recommends marking the casing positions prior to dis- assembly. NOTICE Identification of the assembly devices Not all assembly devices are marked with a part number.
Page 88
Disassembly and assembly Page 58 / 113 Tightening torques for assembly devices Unless described otherwise, the screws and nuts of the assembly devices supplied by ABB Turbo Systems must be tightened so they rest firmly against the surface. Suspended loads Loads that are not attached according to regulations can cause injury to per- sonnel or fatal accidents.
Clearances outside the tolerance Serious damage to engines or property can be caused by clearances out- side the tolerance and excessively worn parts. CAUTION Have the components assessed and, if necessary, replaced by an ABB Turbocharging Service Station. Figure 28: Axial clearance...
Page 102
Blocked areas on nozzle ring If a nozzle ring is blocked in some areas or is covered by loose parts, we would recommend appointing an ABB Turbocharging Service Station to inspect the turbine blades and carry out a crack inspection.
Clearances outside the tolerance Serious damage to engines or property can be caused by clearances out- side the tolerance and excessively worn parts. CAUTION Have the components assessed and, if necessary, replaced by an ABB Turbocharging Service Station. Figure 53: Axial clearance...
Blocked areas on nozzle ring If a nozzle ring is blocked in some areas or is covered by loose parts, we would recommend appointing an ABB Turbocharging Service Station to in- NOTICE spect the turbine blades and carry out a crack inspection.
A locked rotor must be removed after emergency operation and checked for unbalance (see chapter Removing the cartridge group [➙ 67]). The unbalance check must be carried out by an ABB Turbocharging Service Station. Exception The exception concerns customer requirements for test bed runs of new engines at a maxi- mum engine load of up to 25 %.
If the total acid number (TAN) is greater than 2 mg KOH/g, the following mothballing measures are necessary after taking an engine out of operation: Dismantle the turbocharger. The rotor and the bearing parts must be removed by an official ABB Turbocharging service station and refitted afterwards. Clean all parts.
The casings of the turbocharger remain attached to the engine, the rotor and bearing parts are dismantled by an ABB Turbocharging Service Station and stored separately The turbocharger has been completely removed, either as a whole unit or in individual...
Serial number (HT……) Designation and part number. Spare parts can be ordered from any ABB Turbocharging Service Station. If different model variants are not taken into account in this document, contact an ABB Turbocharging Service Station. Dispose of placed and unusable parts in an environmentally-friendly and professional ...