Operation Manual / 4 Product description / A100-M axial
8
Disassembly and assembly
8
Disassembly and assembly
8.1
Introduction
Further operations
This Operation Manual may be used to carry out only those operations that
are described in it. Further operations that are executed in an incorrect way
CAUTION
can lead to serious damage to the machine.
ABB Turbo Systems recommends having further operations carried out
only by trained personnel from an ABB Turbocharging Service Station.
Marking casing position for assembly
ABB Turbo Systems recommends marking the casing positions prior to dis-
assembly.
NOTICE
Identification of the assembly devices
Not all assembly devices are marked with a part number. Identification is guaranteed by the
tool list. This list is enclosed in the toolbox.
Servicing the assembly devices
Assembly devices must be checked for damage before and after use.
Visually inspect for corrosion, cracks, deformation and wear.
WARNING
Damaged assembly devices must no longer be used and must be
replaced.
Customer spare part set
Before starting operations, make sure the required customer spare part sets are available.
See chapter Spare parts [➙ 105].
Tightening torques for components of the turbocharger
The specified tightening torques of the screw fittings must be observed (Table of tightening
torques [➙ 90]).
© Copyright 2016 ABB. All rights reserved.
HZTL4033_EN
Page 57 / 113
Revision A
July 2016