hit counter script

Preparing For Installation; Warnings; Chapter 2 Installing And Starting The Switch - Cisco Catalyst 3550 Installation Manual

Multilayer switch
Hide thumbs Also See for Catalyst 3550:
Table of Contents

Advertisement

Preparing for Installation

Preparing for Installation

Warnings

Warning
Warning
Warning
Warning
Warning
Catalyst 3550 Multilayer Switch Hardware Installation Guide
2-2
This section covers these topics:
Warnings, page 2-2
EMC Regulatory Statements, page 2-4
Site Requirements, page 2-6
Verifying Package Contents, page 2-7
These warnings are translated into several languages in
Safety Warnings."
This equipment is to be installed and maintained by service personnel only as
defined by AS/NZS 3260 Clause 1.2.14.3 Service Personnel.
Only trained and qualified personnel should be allowed to install or replace this
equipment.
Read the installation instructions before you connect the system to its power
source.
Before working on equipment that is connected to power lines, remove jewelry
(including rings, necklaces, and watches). Metal objects will heat up when
connected to power and ground and can cause serious burns or weld the metal
object to the terminals.
Do not stack the chassis on any other equipment. If the chassis falls, it can
cause severe bodily injury and equipment damage.
Chapter 2
Installing and Starting the Switch
Appendix C, "Translated
78-11358-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents