11.2 Work Items, Work Assignment, and Work Time

"Table11.2" lists the work items, standard work time, and the person in charge of these types of work.
Work item

Checking the delivered items

Installing option
Verifying operation
Preparation of handing over to
the System Administrator
Handover to the system administrator
SET1103000

11.3 Procedure for installing PSU

SET1103010
11.3.1 Checking the delivered items
(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The target functions can be used with the specifications and version level of units delivered
separately due to delivery considerations.
(2) Proceed to
SET1103020

11.3.2 Installing PSU

Install according to the following procedures.
(1) Remove the PSU dummy.
(2) Install the PSU, and wait for 10 seconds or more.
See Appendix F.6.1
(3) Connect the power cable to the installed PSU. (See "Table 11.3.2".)
Amount of PSU
3
4
"11.3.2 Installing
PSU".
"Installing
PSU".
Table 11.2
Person in charge
Service engineer
Service engineer
Service engineer
Service engineer
System administrator and
Service engineer
Table 11.3.2
See "Input Power Systems"
See Appendix D.2
See Appendix D.3
73
Work time
(minute)
5
5
11
1
5
"3
PSUs"
"4
PSUs"