Installation
Installation map (LZ-H025GBA4/LZ-H035GBA4/LZ-H050GBA4/LZ-H080GBA4/LZ-H100GBA4)
Plane figure
EA
OA
Front view
Duct slope: More than 1/30(wall side)
obtaining of right distance
(Preventing penetration of rain water)
New type hood
(Preventing penetration of rain water)
Three dimension view
Installation of maintenance cover
Ventilator
Inspection hatch
Duct
Ventilator
EA
OA
1m or more
Inspection hatch
Maintenance cover
Control box
SA grille
EA
Ventilator
main body
OA
RA grille
SA grille
Maintenance space
Ceiling fixing bolt(Supplied by installer)
1m or more
SA
RA
SA grille
RA grille
Maintenance space
600x600
Inspection hatch
Installation
Installation manual 11