With terminal housing ● SITRANS FCS400 sensor ● SITRANS FCT030 transmitter with terminal housing assembled ● Mounting bracket and cushion pad ● Sensor cable ● Packet of cable glands ● Quick Start guide ● CD containing software, certificates and device manuals Note Supplementary information Supplementary product and production specific certificates are included on the SensorFlash...
Page 3
Note Hygienic applications If the device is wall or pipe-mounted in a hygienic application, always use domed nuts. Mounting the transmitter 1. Remove screw from mounting bracket. 2. Mount transmitter on mounting bracket taking care that the flutes on the mating faces are correctly engaged. 3.
Page 4
Vertical rotation 1. Loosen locking cap at end of mounting bracket by three turns. 2. Carefully loosen and rotate transmitter into desired position (15° steps). 3. Firmly tighten locking cap (torque: 25 Nm). Turning the local display The local display can be turned in steps of 30° in order to optimize the viewing angle. 1.
Page 5
8. Reinstate display cover until mechanical stop. Wind back lid by one turn. 9. Mount o-ring by pulling it over the display cover and turn display cover until you feel friction from the o-ring on both sides. Wind display cover further by one quarter of a turn to seal on the o-ring. 10.
Page 6
Application terminals A label showing the configuration is placed at the back of the terminal connections lid. ① Power supply connections L/+ Terminal 1 Terminal 2 Terminal 3 ② Key to symbols Configured as active input/output Configured as passive input/output NO Connected as normally open contact NC Connected as normally closed contact ③...
Page 7
Line Neutral Ground Used in current output active configuration Used in current output active and passive configuration Used in current output passive configuration Not used IO2+ Signal output channel 2 positive Signal output channel 2 common (10) IO2- Signal output channel 2 negative (11) IO3+ Input/output channel 3 positive...
Page 8
1. Insert wiring tool hook into receptor slot. 2. Press wiring tool wedge into top slot to spread clamp plates. 3. Insert wire. 4. Release wiring tool. Power supply 1. Flip open power supply terminal protection cover. 2. Remove cap and ferrule from cable gland and slide onto cable. 3.
Page 9
AC connection DC connection Power: 100 to 240 VAC +10/-15%, 47 to 63 Hz Power: 20 to 27 VDC +10/-10% 6. Close and latch power supply terminal protection cover. 7. Tighten cable gland. Current output/HART (channel 1) 1. Remove cap and ferrule from cable gland and slide onto cable. 2.
Page 10
Inputs and outputs (channels 2 to 4) 1. Remove cap and ferrule from cable gland and slide onto cable. 2. Push cable through open gland and cable path. 3. Restore ferrule and tighten cap to lightly hold cable in place. 4.
Page 11
Note Active or passive current output is preselected at ordering. Factory Software Channel 2 Channel 3, configuration configuration Channel 4 Signal output Current Output Pulse Output Active Frequency Output Status Output If Status Output: Alarm Class Alarm Item Primary Valve Dosing Control Secondary Valve Dosing Control...
Page 12
Relay output Alarm Class Alarm Item One Stage Dosing Two Stage Dosing Normally closed Note Load Signal output: < 500 Ω at 14 to 24 VDC (active), 14 to 30 VDC (passive) Relay output: 30 VAC/VDC, 100 mA Passive signal input: 15 to 30 VDC, 2 to 15 mA Connection check-up 1.
Page 13
Local user interface ① Full graphical display ② LED (for indication of key operation) ③ Capitance proximity keypad Note LUI timeout If no key is pressed for 10 minutes, the display switches to show operation view. Note Operation does not require opening of the device. This means that the high degree of protection of IP67 and safety in hazardous locations are guaranteed at all times.
Page 14
Navigating the views Browse the views and menu items using the control buttons as follows: Table 5-1 Measurement view Function No functionality Go to the previous menu in the operation view Go to the next menu in the operation view Enter the navigation view Table 5-2 Parameter edit view...
Page 15
View Text Options/description Language Set the language: English, Deutsch, Français, Italiano, Español, Português, РУССКИЙ, 汉语, Polski, Dansk, Svenska, Suomeksi "About" Information about the Quick Commissioning wizard Set Date and Time The set date and time (real time clock) is used for all time stamps of logged information Quick Commissioning The Quick Commissioning wizard comprises the most important...
Page 16
The Quick Commissioning wizard will guide you through configuration of parameters essential for your application. You configure parameters essential for your application by selecting the configuration path and subwizards appropriate for your application. The Basic Configuration wizards guide you through setup of process values (Process Values wizard) and inputs and outputs (Input/Outputs wizard) for your application.