hit counter script

Wiring Design; System Configurations - Mitsubishi Electric QAHV-N560YA-HPB Data Book

Hot water heat pump
Hide thumbs Also See for QAHV-N560YA-HPB:
Table of Contents

Advertisement

5. Wiring Design

5-1. System Configurations

5. Wiring Design
1. Types of control cables
Remote controller cable
Control
M-NET cable between units *1
cable
wiring
External input wire size
External output wire size
*1. Use a CVVS or CPEVS cable (Max. total length of 200 m) if there is a source of electrical interference near by (e.g., factory) or the total length of control
wiring exceeds 120 m.
*2. When the wiring length exceeds 10 m, use wire of 1.25 mm².
2. System Configuration
(1) Individual system
* Each unit is operated individually by connecting a dry contact switch/relay to each unit.
External
temperature
sensor
Field-supplied dry contact
switch/relay or remote
controller (PAR-W31MAA) or
centralized controller (AE-200)
(2) Multiple system (2-16 units)
* A group of unit that consists of one main unit and up to 15 sub units is operated collectively by connecting an external
water temperature sensor and a dry contact switch/relay to the main unit.
External
temperature
sensor
Field-supplied dry contact
switch/relay or remote
controller (PAR-W31MAA) or
centralized controller (AE-200)
MEES19K001
Size
Recommended cable types
Size
Recommended cable types
Unit (MAIN circuit)
PCB
Field-supplied dry contact
switch/relay or remote
controller (PAR-W31MAA) or
centralized controller (AE-200)
Unit (MAIN circuit)
PCB
MAIN unit
Inter-unit wiring
(M-NET line)
0.3 - 1.25 mm² (Max. 200 m total) *2
More than 1.25 mm² (Max. 120 m total)
Shielding wire CVVS, CPEVS or MVVS
Unit (MAIN circuit)
External
PCB
temperature
sensor
Unit (MAIN circuit)
PCB
SUB unit
Inter-unit wiring
(M-NET line)
CVV
Min. 0.3 mm²
1.25 mm²
Unit (MAIN circuit)
PCB
SUB unit(s)
n units
40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qahv-n560ya-hpb-bs

Table of Contents