Prepare Your Location
Prepare Your Location
This section illustrates how the building that houses the chassis must be properly grounded to the earth ground.
Figure 3: Building with Rack Room Connected to Earth Ground
Prepare Yourself
This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to
the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Hardware Installation Guide for Cisco NCS 5500 Series Modular Routers
24
Prepare for Installation