UPS5000-E-(50 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Figure 3-26 Input terminals
Step 2 Take out PC boards from near the input copper bar, and install them based on the positions of
the positioning holes.
Figure 3-27 Installing PC plates
----End
02311FTE-004 and 02311FTE-006 Cabinet Input
Step 1 Connect two AC input power cables to input terminals 1L1, 1L2, 1L3, 1N and 2L1, 2L2, 2L3,
2N respectively on the UPS cabinet.
Issue 09 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
80