hit counter script
Download Print this page
ABB EVLunic V1 Installation Manual
ABB EVLunic V1 Installation Manual

ABB EVLunic V1 Installation Manual

Pedestal – floor-mounted column
Hide thumbs Also See for EVLunic V1:

Advertisement

Quick Links

Document: Rev. 1.00 / Document No.: 90333 │ Date 21.08.2018
Installation manual Rev. 1.00
EVLunic
Pedestal – floor-mounted column
Floor-mounted column –
Installation manual
Specifications are subject to change due to ongoing technical development. Errors and omis-
sions excepted. All rights reserved.
All intellectual property, including trademarks and copyrights, is the property of the
respective owner. Any unauthorized use of such intellectual property is expressly forbidden.
English

Advertisement

loading

Summary of Contents for ABB EVLunic V1

  • Page 1 Document: Rev. 1.00 / Document No.: 90333 │ Date 21.08.2018 Installation manual Rev. 1.00 EVLunic Pedestal – floor-mounted column Floor-mounted column – English Installation manual Specifications are subject to change due to ongoing technical development. Errors and omis- sions excepted. All rights reserved. All intellectual property, including trademarks and copyrights, is the property of the respective owner.
  • Page 2 Floor-mounted column - Installation manual Safety instructions WARNING! Not observing the safety instructions can result in risk of death, injuries and dam- age to the device! The producer assumes no liability for claims resulting from this! Electrical hazard! The installation, commissioning and maintenance of the charging station may only be performed by correctly trained, qualified and authorized electricians who are fully responsible for the compliance with existing standards and in- stallation regulations.
  • Page 3 Overview V1 floor-mounted column The V1 floor-mounted column is designed for the installation of one charging station on the column. V2 floor-mounted column The V2 floor-mounted column is designed for the installation of two charging stations on the column. V3 floor-mounted column The V3 floor-mounted column is designed for the installation of two charging stations on the column.
  • Page 4: Location Requirements

    WARNING! Electrical hazard! The V2/V3 floor-mounted column must always be fitted with two charging stations! There can be no open cable openings in the column. Location requirements General: · All of the location requirements for the charging station in the " Installation man- ual"...
  • Page 5 Anchoring to the base The enclosed dowels must be used for anchoring (6 x Hilti HKD-ER compact dowels M8x30). Technical data Anchorage ground Standard concrete with a strength class of C20/25-C50/60 or greater Recommended load Tension N (uncracked concrete) Per dowel Transversal shear V (uncracked con- 3,9 kN crete)
  • Page 6 Note The images are valid for all versions. Thread in cable ► Thread the connection cables from the bottom through the column upwards through the cable opening. Floor-mounted column from below Anchoring ► Position the column directly over the cable outlet. ►...
  • Page 7 Remove edge protection ► Remove the edge protection on the cable opening of the column immediately before installing the charging station (see figure). Remove edge protection Mounting the charging stations ► Mount the charging stations on the column using the enclosed screws. Connecting and commissioning ►...
  • Page 8 Document: V 1.00 / Document No.: 90333 │ Date 21.08.2018...

This manual is also suitable for:

Evlunic v2Evlunic v3