hit counter script

AEG MTH 350 Operation And Installation page 36

Hydraulically controlled, open vented small instantaneous water heater with bare wire heating system
Table of Contents

Advertisement

Available languages

Available languages

Installation
10.2.3 Oversink installation, non-pressurised, with
non-pressurised tap
Tap installation
» Install the tap. For this, also observe the tap operat-
ing and installation instructions.
Material losses
!
» When making the connections, counter the
torque on the appliance using a size 14 spanner;
see chapter "Installation alternatives / Under-
sink installation".
Appliance installation
» Fit the appliance to the tap with the water
connections.
36
10.3 Connecting the power supply
DANGER Electrocution
Carry out all electrical connection and installation
work in accordance with regulations.
DANGER Electrocution
Ensure that the appliance is earthed.
Ensure the appliance can be separated from the
power supply by an isolator that disconnects all
poles with at least 3 mm contact separation.
DANGER Electrocution
The appliances are delivered with a power cable
(MTH 350 with plug).
Connection to a permanent power supply is pos-
sible, provided the fixed cable has a cross-section
that is at least equal to that of the standard power
cable of the appliance. A maximum cross-section of
3 x 6 mm² may be used.
» If the appliance is installed over the sink, route
the power cable behind the appliance.
Material losses
!
When making the connection to a standard safety
socket (in the case of a power cable with plug), en-
sure that the socket is freely accessible after the
appliance has been installed.
Material losses
!
Take note of the type plate. The specified voltage
must match the mains voltage.

Advertisement

Chapters

Table of Contents
loading

Table of Contents