Step 7 Adjust the cabinet position so that the expansion bolt holes are aligned with the six holes at
the bottom of the cabinet.
Step 8 Secure the two antiseismic kits to the floor at the front and rear of the cabinet by using six
M12 expansion bolts, as shown in
Figure 3-14 Securing the antiseismic kits to the floor
----End
3.2.3 (Optional) Installing an IP21 Component
Context
If an IP21 component is installed for the UPS5000-E, top cable routing is not supported and
the top outlet kit cannot be installed.
Procedure
Step 1 Install leveling feet at the bottom of the IP21 component, with two long feet on the front and
two short feet at the rear, as shown in
Issue 06 (2020-01-10)
Figure
Figure
Copyright © Huawei Technologies Co., Ltd.
3-14.
3-15.
3 Installation
54