Staks benching assembly Base assembly Begin assembly of bench in its permanent location. Once assembled the bench will be difficult to move. Attach T-nuts to H-bases using M6 x 16mm (Part #: 1416448) screws. Screw through mount plate from below and into T-nut.
Staks benching assembly Organizer installation Attach stanchion to bottom of organizer by screwing #8 x 1" screws through stanchion into pre-bored pilot holes. Stanchion Model number: 6-SSS Remove extrusions from toolbar. Upper extrusions will not be present if wood privacy panels are to be installed.
Page 5
Staks benching assembly Determine distances shown above and cut extrusions to match. Extrusions can be cut with a utility knife. Replace extrusions leaving space for stanchions. Distance Distance A Distance A Drop organizers in place. 10. Make sure the holes in the bottom of the stanchions are aligned with the holes in the toolbar.
Staks benching assembly Privacy screen installation Install privacy screens into tool rails. Use a RUBBER MALLET to work screen all the way in until seated on the bottom extrusion. Loosen T-nut screws and slide back H-base for access to bottom of toolbar.
Staks benching assembly Worksurface installation Note: Support rails are used on 22", 30" and 36" deep tops that are wider than 48". Position support rail on bottom side of worksurface 6” from user edge in center of worksurface. Attach with #10 x 5/8" screws.
Staks benching assembly Top strap installation Use M6 x 50mm screw to attach top strap to tool bar and stanchion. Top strap ships with tool rail kit Part #: 1552075 Top Strap Part #: 1416448 Secure top strap to bottom of worksurfaces with eight (8) #8 x 1"...
Page 9
Staks benching assembly Insert T-nut, angled face up, inside of grooved bottom of toolrail. Use M6 x 16mm screw to attach top strap to T-nut inside of tool bar. When tightening screw, T-nut should turn inside of groove and grip bottom of toolbar.
Staks benching assembly Power installation - premium and basic kits Remove faceplates (held on with magnets), and end caps if installing premium power blocks. Hold power block up to bottom edge of toolbar so tabs are inserted into groove on bottom of toolbar.
Page 11
Staks benching assembly Plug in one jumper cable between two power blocks. Jumper cable should pass through O-rings. Jumper cable end must be pushed in until it snaps into place. Plug in power in-feed into any receptacle block in the run.
Staks benching assembly Power installation - economy kit Attach block clip to two T-nuts in toolbar using M6 x 10mm screws. See T-nut installation instructions on page 9. T-nuts Block clip Part #: 1554819 Engage slotted grooves on top of double block system to flanges on block clips.
Page 13
Staks benching assembly Plug in one jumper cable between two power blocks. Jumper cable end must be pushed in until it snaps into place. Install duplex receptacles as shown on bottom of page 10. ofs.com imagine a place® 800.521.5381 Assembly instructions...
Staks benching assembly Top strap installation and cable basket assembly Secure top strap to bottom of work surfaces with eight (8) #8 x 1" screws for each top strap (HK-31). Clamp Assemble basket clamps with two small clamp plates on the top and on large clamp plate on the bottom.
Staks benching assembly Cable basket installation Power block mounted basket Attach basket to O-rings on power block using 60mm Hex head bolt and 1 3/4" standoff. O-ring Part #: 1512929 Stand off Part #: 1512614 Bolt Part #: 1512615 (M6-1.00 x 150mm) Toolbar mounted basket Attach basket to T-nut in tool bar using 6"...