Install the Appliance
•
•
•
•
Task 1: Install into a Rack
For details about how to install the appliance into the rack, see the Cisco UCS C220 M5 Server Installation
and Service Guide at
https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/c/hw/C220M5/install/C220M5.html.
Task 2: Insert the SFP Network Connection Modules
The CE1200 ships with two 10 Gb fiber SFP modules and two 1 Gb copper SFPs.
Caution
To avoid compatibility issues, the following restrictions apply to SFP modules.
• Only use the SFPs supplied with the appliance. (Note that SFP modules from M4-based Expressways
• Do not mix SFPs. Either insert two 10 Gb fiber SFPs or two 1 Gb copper SFPs.
The following requirements also apply to the SFPs:
• Insert them only into the designated SFP ports on the PCIe 01 card. The leftmost SFP port corresponds
• Although SFPs support auto-negotiation for speed and duplex, they only negotiate one speed—to the
Task 1: Install into a Rack, on page 17
Task 2: Insert the SFP Network Connection Modules, on page 17
Task 3: Connect and Power On, on page 18
Task 4: Verify Power Status, on page 18
should not be reused in this appliance.)
to LAN1 on the Expressway user interface.
stated speed of the SFP and full duplex. This means you must connect them to a switch port that supports
the stated speed and full duplex:
• 10 Gb full duplex for fiber SFPs
• 1 Gb full duplex for copper SFPs
C H A P T E R
Cisco Expressway CE1200 Appliance Installation Guide (14.0)
7
17