ABB Emax Link 2 UR 1558 Application Manual

ABB Emax Link 2 UR 1558 Application Manual

Abbreviated low voltage, metal-enclosed, drawout switchgear

Advertisement

Quick Links

A P P L I C AT I O N G U I D E
Emax Link
2 Abbreviated
Low voltage, metal-enclosed,
drawout switchgear

Advertisement

Table of Contents
loading

Summary of Contents for ABB Emax Link 2 UR 1558

  • Page 1 — A P P L I C AT I O N G U I D E Emax Link 2 Abbreviated ™ Low voltage, metal-enclosed, drawout switchgear...
  • Page 2 E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E...
  • Page 3: Table Of Contents

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 4: General Description

    General description Enter the ever-growing low voltage switchgear market without the high overhead costs of labor, design and testing. The ABB Emax Link 2 UR 1558 structures provide a turnkey solution for OEMs. Emax Link 2 combined with SACE Emax 2 circuit breakers ®...
  • Page 5: Product Description

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 6: General Information

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E — Product description General information ABB Emax Link 2 assemblies are shipped in one or more shipping splits, depending on the total number of vertical sections, or the limitations of handling facilities at the installation site. A typical configuration includes three vertical sections.
  • Page 7: Section Weight

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 8: Assembly Construction

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 9: Busbar Compartments

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 10: Bus Ratings And Sizes

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 11: Vertical Distribution Busbar

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 12: Wireways

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 13: Installation Guidelines

    • Shipping split connection hardware 2. Check that all components are in good condition. If there is any evidence of damage to the equipment, contact an ABB representative to evaluate the condition of the equipment before proceeding with installation. 3 ft Min.
  • Page 14: Preparation

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 15: Splice Horizontal Busbars

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 16 E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 17: Attach Switchgear To Floor

    Switchgear may be: lowering of circuit breakers into the compartments. • Attached to a base frame that has been secured See the corresponding ABB drawing for detailed to the floor (preferred method). operating instructions. • Bolted directly to a concrete floor by setting To attach the lifting device: vertical mounting bolts in the floor.
  • Page 18: Raise Lift Device

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 19: Connect Cable And Wiring

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 20 E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 21: Direct Connections To Main Sections

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 22: Inspect Busbars

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 23: Semi-Annual Inspection

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 24: Torque Fasteners

    E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 25 E M A X L I N K 2 A B B R E V I AT E D LV S W I TC H G E A R A P P L I C AT I O N G U I D E —...
  • Page 26 ABB Inc. does not accept any its contents – in whole or in parts – is responsibility whatsoever for potential forbidden without prior written consent of errors or possible lack of information in ABB Inc. © 2021 ABB Inc. All rights reserved. this document.