hit counter script

Initial Power Up, Calibration, And Registration (Ac Power Applied) - Cisco DPC3939 User Manual

16x4 wireless residential voice gateway
Hide thumbs Also See for DPC3939:
Table of Contents

Advertisement

Chapter 4 Operation of Front Panel Indicators
Initial Power Up, Calibration, and Registration (AC
Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the Residential Gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the Residential Gateway. Use this chart to troubleshoot the power up, calibration,
and registration process of your Residential Gateway.
Note: After the Residential Gateway completes Step 7 (Data Network Registration
Complete), the Residential Gateway proceeds immediately to Normal Operations.
See Normal Operations (AC Power applied) (on page 40).
Front Panel LED Status Indicators During Initial Pow er Up, Calibration, and
Registration
Step:
Front Panel
Indicator
1
POWER
2
US/DS
3
ONLINE
4
2.4 GHz
5
5 GHz
6
TEL
1
7
TEL
2
8
BATTERY
38
Part 1, High Speed Data Registration
1
2
3
Self
Downstream
Downstream
Test
Scan
Signal Lock
On
On
On
On
Blinking
On
On
Off
Off
On
On or Blinking
On or Blinking
On
On or Blinking
On or Blinking
On
Off
Off
On
Off
Off
On – When battery is charged
Blinks – When battery charge is low
Off – When there is no battery in the unit
4
5
Ranging
Requesting IP
Address
On
On
On
On
Off
Off
On or
On or Blinking
Blinking
On or
On or Blinking
Blinking
Off
Off
Off
Off
6
Request High
Speed Data
Provisioning File
On
On
Blinking
On or Blinking
On or Blinking
Off
Off
OL-29163-01

Advertisement

Table of Contents
loading

Table of Contents