9. Reverse the module and assemble S-PCB to holder.
10. Assemble the Guide Panel.
*Then assemble the Cover shield
and attach the tape to the Bridge Cable.
*Assemble the Screws Screw.
- Guide Panel Screws(Up10ea / L 6ea / R 6ea)
Cover Shield Screws(Left 4ea / Right 5ea).
- 27 -
Copyright ©
LG Electronics Inc. All rights reserved.
Only for training and service purposes.