3-10.
BT Panel Section
3-10-1.
BT Panel Assembly
Preparation
1.
Remove the cabinet (G) assembly. (Refer to
2.
Remove the heat sink (GP) assembly. (Refer to
3.
Remove the top cabinet assembly. (Refer to
4.
Remove the EF-1003 board. (Refer to
5.
Remove the IR cabinet assembly. (Refer to
6.
Remove the inner mold (T) assembly. (Refer to
7.
Remove the cabinet (R) assembly. (Refer to
Procedure
1.
Remove the grip belt sheet metal (F).
(1) Remove the two screws.
(2) Release the projection and boss, and then remove the grip belt sheet metal (F).
HXR-NX80/HXR-MC88
"3-2. Cabinet (G)
"3-3. Heat Sink (GP)
"3-5. Top Cabinet
"3-6. EF-1003
Board".)
"3-7. IR-1009
"3-8. Inner Mold (T)
"3-9-1. Cabinet (R)
Hole
Boss
Assembly".)
Assembly".)
Assembly".)
Board".)
Assembly".)
Assembly".)
Precision screw
(P1.7 x 4)
Projection
Grip belt sheet metal (F)
Hole
Precision screw
(P1.7 x 4)
3-30