hit counter script

Prerequisites For Operation And Maintenance - ABB HT609404 Operation Manual

Table of Contents

Advertisement

Operation Manual / A130-H.. - A140-H..
2 Safety / 2.11 Prerequisites for operation and maintenance
2.11

Prerequisites for operation and maintenance

Responsibility of the operating company
In awareness of its responsibility, the operating company must ensure that only authorised
personnel work on the turbocharger, who:
¡
Are versed in the general and locally applicable regulations for occupational safety and
accident prevention
¡
Are equipped with the prescribed personal protective equipment
¡
Have read and understood the Operation Manual
¡
Have been instructed in the use of the turbocharger.
The safety-conscious work of the personnel and adherence to the Operation Manual must be
checked periodically.
Suitable working materials and personal protective equipment must be kept in a perfect
condition.
Only authorised personnel may remain in the vicinity of the turbocharger when the engine is
running.
Competence of personnel
The turbocharger must only be operated and serviced by trained and authorised personnel.
Basic mechanical training is a prerequisite.
Modifications to the turbocharger
Modifications to the turbocharger must be approved by ABB.
WARNING
Use original parts
Operation of the turbocharger with non-original parts can impair the safety
of the turbocharger and can cause serious damage to property and injury to
personnel.
Only use original parts from ABB.
u
Original parts and accessories are specially designed for ABB turbochargers.
ABB accepts no liability for any damage resulting from the use of non-original parts and cor-
responding accessories.
© Copyright 2021 ABB. All rights reserved.
HZTL4030_EN
Rev.G
July 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

A140-h56

Table of Contents