Operation Manual / Power2 550-M / High-pressure stage
9 Disassembly and assembly / 9.10 Installing the air inlets
9.10
Installing the air inlets
Always replace the O-ring (82010) with a new one (see
u
Measure clearance N (see
u
Fig. 40: Installing the air inlet
Part number
72013
Table 48: Tightening torque (72013)
1. Install the radial air suction branch (82000) with the bellows (82300) or the axial air suc-
tion branch together with the O-ring (82010), respectively.
2. Tighten screw (72013).
© Copyright 2022 ABB. All rights reserved.
Measuring radial clearances N and R
HZTL4058_EN
Ordering spare parts
→102).
→91).
Tightening torque
M12
85 Nm
Rev.F
March 2022