hit counter script

Preparing For Installation; Warnings; C H A P T E R 2 Switch Installation (24- And 48-Port Switches) - Cisco CATALYST 2960 Hardware Installation Manual

Cisco systems switch user manual
Hide thumbs Also See for CATALYST 2960:
Table of Contents

Advertisement

Preparing for Installation

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety
Information for the Catalyst 2960 Switch guide.
Warning
To prevent the switch from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of 113•F (45•C). To prevent airflow restriction, allow at least
3 inches (7.6 cm) of clearance around the ventilation openings. Statement 17B
Before working on equipment that is connected to power lines, remove jewelry (including rings,
Warning
necklaces, and watches). Metal objects will heat up when connected to power and ground and can
cause serious burns or weld the metal object to the terminals. Statement 43
Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury
Warning
and equipment damage. Statement 48
Ethernet cables must be shielded when used in a central office environment. Statement 171
Warning
Warning
If a redundant power system (RPS) is not connected to the switch, install an RPS connector cover on
the back of the switch. Statement 265
Warning
Attach only the following Cisco RPS model to the RPS receptacle:
PWR-RPS2300, PWR675-AC-RPS-N1=. Statement 370
Read the wall-mounting instructions carefully before beginning installation. Failure to use the
Warning
correct hardware or to follow the correct procedures could result in a hazardous situation to people
and damage to the system. Statement 378
Warning
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Statement 1001
Warning
Read the installation instructions before connecting the system to the power source. Statement
1004
Catalyst 2960 Switch Hardware Installation Guide
2-2
Chapter 2
Switch Installation (24- and 48-Port Switches)
OL-7075-09

Advertisement

Table of Contents
loading

Table of Contents

Save PDF