hit counter script

Installing An Infiniband Switch Module - Cisco SFS 3012R Hardware Installation Manual

Cisco systems multifabric server switch installation guide
Table of Contents

Advertisement

Installing an InfiniBand Switch Module

Note
Push the gateway module firmly into the slot. The ejector lever begins to close.
Step 6
Step 7
Push the ejector lever up until it clicks into place.
Step 8
Follow the procedures in
software image on the gateway module.
All cable connections to Ethernet gateways must use shielded RJ45 CAT5 Ethernet cables.
Note

Installing an InfiniBand Switch Module

To install an InfiniBand switch module, perform the following steps:
Ground yourself using an approved ground wrist strap.
Step 1
Remove the blanking panel if one resides in the slot with a number 1 Phillips-head screwdriver.
Step 2
Remove the switch module from any packaging.
Step 3
Extend the ejector levers on the left-hand side and on the right-hand side of the switch module
Step 4
completely.
Insert the switch module into slot 15 or slot 16 such that the ejector levers sit on the bottom of the switch
Step 5
module.
Cisco SFS 3012R Multifabric Server Switch Hardware Installation Guide
3-4
You can install gateways in slots 2 (second from left) through 13 (second from right). Populate
your Cisco SFS 3012R Server Switch from left to right.
Chapter 4, "Viewing and Updating the Software Image"
Chapter 3
Installing and Removing Server Switch Field Replaceable Units (FRUs)
to update or verify the
OL-11187-01

Advertisement

Table of Contents
loading

Table of Contents

Save PDF