Product Conveyance Installation
2. Transportation & Installation
2.1 Transportation
Units are normally shipped ex-works. They are inspected, tested, and packaged prior to dispatch, carefully loaded
into containers, shipped to country of destination, unloaded, and delivered to jobsite.
Immediately upon receipt at jobsite, inspection should be made for any damage, which must be reported to
Johnson Controls within 24 hours of receipt of goods.
When moving the fan coil unit, please handle with care and prevent the coil water inlet, outlet and drain pipes
from getting bent or damaged. Use only approved lifting equipment. Do not carry the unit by the fan or motor
assembly to avoid distortion.
Package for YECFC01~03 Units
Package for YECFC04&05 Units
2.2 Acceptance
All items must be checked against customer purchase order, delivery docket, and submittal drawings for
correctness and any claims for non-compliance or short supply reported to Johnson Controls within 72 hours of
delivery.
2.3 Storage
If the unit is stored on the jobsite, it should be protected against exposure to the elements.
Specifically units should be securely protected from theft, accidental damage, water ingress, moisture damage,
rusting, or dust.
2.4 Lifting of the Unit
During the installation process, be careful to prevent the unit from any damage due to improper lifting and rigging.
Use only approved lifting equipment. Safety should always be a priority. Only authorized lifting equipment and
trained installers should be used. Equipment should be installed in accordance with all national safety codes.
2.5 Points for Attention before Installation
Before the unit is installed, the following should be verified during the construction of the building:
1. Water Supply
2. Power Supply
3. Supply air, return air, and outside air ducting (if applicable)
4. Ceiling Mounting points
5. Service Access