hit counter script

Lag During Boot Up Due To Power Characterization Check - Cisco Expressway CE1300 Installation Manual

Hide thumbs Also See for Expressway CE1300:
Table of Contents

Advertisement

Lag During Boot up Due to Power Characterization Check

Step 3
Select
USER: Built-in EFI Shell
The EFI shell will load and, after 5 seconds will launch the startup.nsh by default, which will load the recovery image.
Step 4
When prompted, type
The login prompt may interfere with entering
the reimage.
Step 5
After the reboot completes, connect using serial to complete the reset. You will see the factory installation wizard.
Step 6
You can optionally apply any option keys for the appliance (such as room or desktop registrations). If you choose not to
at this stage, they can be applied later through the Expressway web UI or CLI.
Step 7
When prompted, press
The factory installation wizard phase is complete.
Step 8
Power on the appliance, and follow the steps in
Lag During Boot up Due to Power Characterization Check
The power characterization test is run only once when you plug in and power up the CE1300. If the power
characterization test continues to run, causing a lag in the boot time, ensure that it is disabled in the CIMC.
To do this:
Step 1
Log in to the CIMC (see
Step 2
Click the menu arrow in the top-left corner.
Step 3
Go to Chassis > Power management > Power Cap Configuration.
Step 4
Click Disable Power Characterization.
Step 5
Click Save Changes.
Cisco Expressway CE1300 Appliance Installation Guide (X14.3.1)
30
as the boot option.
to press
to proceed with the reinstall.
y
Enter
, press
y
to shutdown the system.
Enter
Run the Install Wizard
Connecting Using CIMC Serial Over
to bypass the prompt and press
Enter
to complete the customer installation wizard.
LAN).
Troubleshooting
again and enter to launch
y

Advertisement

Table of Contents
loading

Table of Contents