hit counter script
Honeywell PRO-2200 Installation Manual

Honeywell PRO-2200 Installation Manual

Power supply with battery backup
Hide thumbs Also See for PRO-2200:

Advertisement

PRO-2200
Power Supply With Battery Backup*
Installation Manual
Part Number: PRO22E1PS
* 4 amp hour and 7 amp hour backup battery sold separately.
TD1140 rev0401

Advertisement

Table of Contents
loading

Summary of Contents for Honeywell PRO-2200

  • Page 1 PRO-2200 Power Supply With Battery Backup* Installation Manual Part Number: PRO22E1PS * 4 amp hour and 7 amp hour backup battery sold separately. TD1140 rev0401...
  • Page 2 PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide...
  • Page 3: Table Of Contents

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide Contents Warnings and Cautions ..................4 Disclaimer ......................6 Product Liability; Mutual Indemnification ...............6 Unpacking Procedure ...................6 Shipping Instructions ....................7 Limited Warranty ....................7 Confidentiality .......................8 PRO2200 Enclosure .....................9 Description ......................9 Dimensions ......................10 Power Supply ......................10 Notes ........................11...
  • Page 4: Warnings And Cautions

    Always make certain that any required approvals are obtained in writing. DO NOT AC- CEPT VERBAL APPROVALS, AS THEY ARE NOT VALID. Northern never recommends using the PRO-2200 or related products as a primary warning or monitoring system. Primary warning or monitoring systems should always meet local fire and safety code requirements.
  • Page 5 PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide CAUTION IF ANY DAMAGE TO THE SHIPMENT IS NOTICED, A CLAIM MUST BE FILED WITH THE RESPONSIBLE COMMERCIAL CARRIER. CAUTION Electro-static discharge can damage CMOS integrated circuits and modules. To prevent damage always follow these procedures: Use static shield packaging and containers to transport all electronic components, including completed reader assemblies.
  • Page 6: Disclaimer

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide Disclaimer Product Liability; Mutual Indemnification In the event that a Customer receives a claim that a Product or any component thereof has caused personal injury or damage to property of others, Customer shall immediately notify Northern in writing of all such claims.
  • Page 7: Shipping Instructions

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide Shipping Instructions To ship equipment back to Northern Computers, Inc.: 1. Contact the customer service department before returning equipment at 800-323-4576. Please have the following available when calling: • A description of the problem or reason equipment is being returned.
  • Page 8: Confidentiality

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide Confidentiality All software, drawings, diagrams, specifications, catalogs, literature, manuals and other materials furnished by Northern relating to the design, use and service of Products shall remain confidential and shall constitute proprietary rights of Northern, and Customer agrees to treat such information as confidential.
  • Page 9: Pro2200 Enclosure

    PRO22ENC1, PRO22ENC2 or the PRO22ENC5 by sliding the unit vertically into the right most card guide. The PRO22E1PS can be wired to the PRO-2200 I/O with the self- contained cabling. The unit can supply up to 4 amps to the 9 panels used in the PRO- 2200 enclosure system.
  • Page 10: Dimensions

    • Maximum battery charging current .5 amp • AC on LED • AC Fail supervision when connected to PRO22IC or other PRO-2200 I/O at PFL (Power Fail) input • Low battery supervision when connected to an auxiliary input • Short circuit and thermal overload protection with self-resetting poly fuses •...
  • Page 11: Notes

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide NOTES...
  • Page 12: Installation Instructions

    I/O. See individual panel installation manual for additional details. DO NOT POWER THE PANELS UNTIL ALL WIRING IS COMPLETE! 9. Wire the Power Fail cable white wire into the PRO-2200 I/O PFL input and the black wire into the common for that input.
  • Page 13: Installation Diagram

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide 13. CHECK ALL WIRING BEFORE POWERING UP THE PRO22E1PS. Unrepairable damage could result from improper wiring. Power up the PRO22E1PS. All panels connected should go through their particular start up sequence. See individual installation manuals for more detail.
  • Page 14: Cable Specifications

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide Cable Specifications Application NCI Part No. Description Max. Dist. Imp. Cap. N-485 connections NC2442-TN Belden 9842 4000' (1200 m) 12.8pf/ft or equivalent CR-1, TR-1, CI-1, KR-1 NC1861-BL 6 conductor shielded 500' (152 m)
  • Page 15: Nci Cable Part Numbers

    PRO-2200 Power Supply With Battery Backup PRO22E1PS Installation Guide NCI Cable Part Numbers Part Number Description Application Length NC1841-GY 18 AWG/4 conductor reader cable 1,000' NC1861-BL-500 18 AWG/6 conductor reader cable 500' NC1861-BL 18 AWG/6 conductor reader cable 1,000' NC18121-YL-500...
  • Page 16 Honeywell Security & Data Collection 2700 Blankenbaker Pkwy, Suite 150 Louisville, KY 40299 (800) 675-3364 www.honeywellaccess.com...

Table of Contents