Page 2
Design Information BEFORE YOU BEGIN WARNING: TO REDUCE THE RISK OF HRE, ELECTRICAL Read these instructions completely carefully. SHOCK OR INJURY TO PERSONS, OBSERVE THE " IMPORTANT - S.vethese instructions for FOLLOWING: local inspector's use. A. Use tiffs unit only in the manner intended by the •...
Advance Planning POWER SUPPLY TOOLS AND MATERIALS REQUIRED (not supplied) IMPORTANT • Tapemeasure - Please read carefully. • Knife WARNING: , ORP ON • Spirit level • Wire cutter THIS APPLIANCE MUST BE PROPERLY GROUNDED. • Wire stripper • Wire nuts ATTENTION •...
Page 6
Advance Plannin Total Equivalent Quantity Equivalent Duct Piece Dimensions Length* Used Length Round, (per toot straight length) (per toot 3-1/4" x 12" this chart to compute maximum length) straight permissible lengths duct runs otltdooI's. 90 ° elboB 17 ft. Note: Do not exceed maximum ?ermissible equivalent lengths! 45 °...
Page 7
Installation Instructions [STEP 1 ] CONSTRUCT CEILING SUPPORT Ceiling Plan the location Hood Determine the exact location of the vent hood. Centerline • Use a plumb bob to check location to be sure countertop/cooktop location below the hood will align exactly.
Installation Instructions [STEP 1 ] CONSTRUCT CEILING SUPPORT (cont.) EXAMPLE B 16"Joist Spacing 11-1/4"InstallCross-Framing Symmetrically About 2x4 Cross \ Framing Align Ductto Cooktop Outline Centerof Cooktop Front of Hood TopView--Ceiling Joists RunPerpendicular t o Frontof Hood EXAMPLE C 2x4Cross 11-1/4"Install Framing Cross-Framing Symmetrically A bout...
Page 9
Installation Instructions 2x 4 Min. I STEP 11CONTINUED CrossFraming ..• Arrange cross flaming in the ceiling to suit the existing suuculre. See examples. - Secure each 2 x 4 block with at least four (4), #10 wood screws, 3" long (not supplied). Use 8 wood screws total for the two supports.
Page 10
Installation Instructions ISTEP 21 REMOVE THE PACKAGING The vent hood is packed separately flom the decorative duct cover or accessory covers ZX1059SFSS or ZX10510SFSS. • Remove the flame, cover, parts box and packaging. • Remove junction box cover. • Install suain relief onto junction box coveL [STEP 3 CHECK INSTALLATION HARDWARE...
Installation Instructions ISTEP 4 ] MOUNT TEMPLATE • Align the template with tile marks on tile ceiling and rope in place. - Be sure tile template is oriented correctly, with tile flont of tile hood. • Use a phnnb bob to be sure the mounting holes will provide parallel alignment with tile countertop...
Installation Instructions [STEP 6 SECURE WIRING STEP 7 SIZE AND INSTALL DUCTWORK • Route house wiring through the ceiling hole and pull a length to reach the hood junction box, approximately 6" below the support. Ceiling Celing House Duct ..LeftSide View :L[__...
Decorative to use UL approved anti-oxidant compound Screw aluminum-to-copper connectors. AVERTISSEM ENT : si l ec ,bl ,ge de la maison n'est pas du type f, deux ills avec un fil de terre, l'installateur dolt fournir un circuit de terre.
Page 15
Installation Instructions STEP 12 INSTALL FILTERS, FINALIZE INSTALLATION FilterSlots • Remove protective film on tile filters. • Tip tile filter into tile lower slots at tile rear of tile opening. I,ift tile filter and pull tlle knob forward until tile filter rests on tlle slots.
Page 16
Note: Prod improvement is a conthluhlg endeavor (;enera] Electric. Therefbre, materials, appearance specifications are subject to change _ithout notice. Monogram: GEConsumer & Industrial Pub.No.49-80153-2 GEAppliances General Electric" Company 11-07 JR Louisville, KY 40225 ge.com Printed in Italy @2007 GE Company...